Panatrol was contracted to design and upgrade a control system for the Coleman Bridge.
Panatrol delivered a comprehensive control system upgrade while minimizing downtime and operational risk to the customer. Key elements of the project included:
This project showcases Panatrol’s ability to execute high-stakes upgrades on mission-critical infrastructure with precision and minimal interruption. By preserving existing wiring and program logic while introducing modern control technology, Panatrol delivered a future-ready solution that maintains the integrity of the bridge’s complex automation requirements.
Bridges like the Coleman Memorial are vital arteries in the transportation network. Panatrol’s innovative approach ensures that this critical structure continues to operate safely and efficiently, demonstrating the company’s deep expertise in industrial automation, legacy system migration, and control system integration.